Hired a 5 ton digger to clear out this lake of silt and spread some clay up the sides. I also dug a smaller pond above it as a silt trap. The project is not completely finished yet as I plan to build a monk water level control system in the main lake and also put sluice gates in the top pond to direct the water into either the main lake or away down the stream. 😊















Leave a comment